图片名称

Product Introduction

A GEOLEED Geocontainer is a large tubular or bag-shaped container made of high-strength, UV-resistant filament woven geotextile or special composite materials. It is filled with a mixture of mud, sand, and water using a high-pressure pump, utilizing the geotextile's filtration properties (retaining mud while draining water) to ultimately form a stable, gravity-based geostructure.

Working Principle

Workflow: Filling, Dewatering, Consolidation

Filling: Connect the mud pump pipe to the filling port of the bag and add flocculant to aid consolidation.

Dewatering: Water seeps out through the pores of the woven fabric, while solid particles are retained inside the bag.

Consolidation: After multiple filling and dewatering cycles, the density of the material inside the bag increases, its volume decreases, and a solid structure is eventually formed.

The stability of stacked geotextile bags mainly relies on the following physical properties:

Friction coefficient: There is significant friction between the bags and between the bags and the ground. To increase stability, staggered stacking (similar to bricklaying) is typically used during construction.

Interlocking effect: When the bags are filled to 70%-80% capacity, they deform under pressure, like "gummy candies," creating a large contact surface. This "interlocking" effect makes them difficult to be swept away by water flow.

Self-weight support: A single filled geotextile bag typically weighs between several hundred kilograms and several tons. This enormous self-weight, combined with gravity, forms a stable retaining wall or breakwater.

Attachment Download

Application Case

Application

Key Application Scenarios

Coastal Protection and Breakwaters: The bags are filled with sea sand and sunk to serve as the core of breakwaters or for constructing artificial islands.

Urban River Dredging: For sediment pollution, Geocontainers are used for dewatering, significantly reducing transportation and disposal costs.

Tailure Treatment: Dewatering and damming of mining waste.

Emergency Flood Control: During floods, temporary dikes are quickly constructed by filling with locally sourced materials (sand).

BECOME OUR PARTNER

Tell Us Your Purpose,our Product Will Meet Your Needs.

Request Quote

We will contact you within one working day. Please pay attention to your email.

SUBMIT